Many customers have entrusted us with their additive printing projects.

We work for both the public and private sectors, highlighting the projects carried out in the industrial and health field.

MERCEDES-BENZ SPAIN

Tooling for screwing up parts

  1. Weight reduction: – 65%
  2. Ergonomic enhancement
  3. Tip smoothing to avoid inadvertent bodily damage
  4. Replenishment time in 36h
  5. Integral saving of costs

Made in 2016

MERCEDES-BENZ SPAIN

Customized protectors in flexible material for areas sensitive to impacts

  1. Customization
  2. Elimination of defects by impact.
  3. Documented and controlled means of production
  4. Replenishment time in 24h
  5. Integral saving of costs

Made in 2017

KONGSBERG

Tooling for forming rubber tubes

  1. Customization
  2. Cost savings: -50%
  3. Replenishment time in 48h
  4. Tolerances +/- 0.1%

Made in 2017

BURUPLAST

Hyper-cooled metal insert for injection molds

  1. Cycle time reduction: -25%
  2. Lead Time: 10 days
  3. Replenishment time in 24h
  4. Machined finish

Made in 2015

ORBEA

Replacement of plastic injection parts by functional parts in 3D Printing (PA12)

  1. Disposal of parts and tools
  2. Lead Time: 24h
  3. Any modification of part without expenses of tools
  4. Integral saving of costs

Made in 2017

COMPETITION VEHICLE

Design and manufacture of structural parts of competition vehicles.

  1. Lightening of weights
  2. We shorten the development deadlines of the project
  3. Any modification of part without tooling costs
  4.  Integral saving of costs

Made in 2017

Other Projects

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.plugin cookies

ACEPTAR
Aviso de cookies